NFCU Winchester Campus Parking Garage

Project HighlightsLED lighting technology9% less energy than code for exterior lights91% less energy than code for garage lightsUPS power system & central web-based monitoring systemCost Effective Fully Open Design for Natural VentilationNo exhaust or circulation fans requiredNo CO monitoring requiredClimate controlled LAN rooms & electric roomLAN rooms & electric room pressurized for dust mitigationNon-potable water…

NFCU Campus Development

Project Highlights LED lighting technology 30% less energy than code for interior lights 40% less energy than code for exterior lights 80% less energy than code for garage lights Automatic dimming of interior lights in response to daylighting Underfloor modular power distribution system Central Outside Air Energy Recovery Ventilators Reduces outside air load by up…

Lee Building

2-story glass atrium with  bridged walkway to the Lee Building4 stories of office area & one-level of parkingSelf-contained variable air volume (VAV) units with water-side economizers on each floor50° F supply air temperature for better dehumidification & comfortFan-powered VAV terminal units for superior ventilation & controlMechanical room for future HVAC equipment to serve the adjacent…

Critical Standby Power Generation Facility

Design Highlights Two 1.5 megawatt diesel engine powered generator sets 1100 KVA UPS system with 2N redundancy and 30 minutes of runtime Below grade conditioned and ventilated battery rooms Service lift for loading and unloading batteries Zoned dry-pipe sprinkler system 15,000 gallon underground, double wall spill containment fiberglass diesel fuel storage tank Redundant fuel transfer…

NFCU Call Center

Design HighlightsHigh ceilings for ambient noise reductionTwo roof-top air conditioning units serving a fan- powered variable air volume (VAV) systemTwo roof-top energy recovery units to reclaim energy lost through exhaust air systemsHigh efficiency, gas-fired condensing boiler system to provide heated water for the fan-powered terminal devicesInterior and exterior LED lighting systems1500 KW Stand-by generator to…

HBL Mercedes Service Lane

New 100% outside air, gas-fired, rooftop unitsNew Gas-Fired High Efficiency Boiler SystemNew Drive-Through Drop Off AreaNew Second Level Vehicle Service Area Mechanical, Electrical, and Plumbing EngineeringExtensive Owner, Architect, Structural Engineer and Civil Engineer CoordinationMEP Bid ReviewConstruction Phase Support “This was an amazing undertaking; Designing a new shop on the roof of the existing shop required…